Gap 1 of 3: The scale 16 locations on the 120-day list in one quarter

Fixed, then failing again: the Stage 5 and 6 wells

Most of Mill Seat’s repeat 120-day locations sit in one band of the landfill, just above the area still too new to be monitored. Several were fixed with new vacuum lines or tuning and were back on the list within about a year.

All locations: Mill Seat

A
MISOT135 Stage 5Aon the 120-day list 2 times
  • Q4 2024120-day list1,160 ppm!; 1,460! at the first recheck; 2,765! at the 30-day recheck One of 16 locations on the list that quarter; operator requested an extension in Feb. 2025
  • Mar 31, 2025RepairNew vacuum line to the existing header installed
  • Q4 2025120-day list2,130 ppm!; 3,953! at the first recheck; 644! at the second Fix: vacuum increased
B
MS6AVC10 Stage 6Aon the 120-day list 2 times
  • Q3 2024Cleared by recheck8,460 ppm!; 820! after soil cover and compaction
  • Q4 2024120-day list724 ppm!; 2,935! at the first recheck DEC moved the deadline to May 3, 2025
  • Feb 2025Alternative remedyOperator plans a new horizontal collector between this well and 5B_VC_02, due by March 4, 2025
  • Q2 2025Cleared by recheck6,680 ppm!; 20 at the first recheck
  • Q3 2025120-day list5,397 ppm!; 5,468! at the first recheck; 2,212! at the second Fix: re-tuned well
C
5B_VC_02 Stage 5Bon the 120-day list 2 times
  • Q4 2024120-day list7,940 ppm!; 928!; 837! DEC moved the deadline to May 3, 2025
  • Feb 2025Alternative remedySame planned horizontal collector as MS6AVC10
  • Q2 2025Cleared by recheck6,254 ppm!; 115 at the first recheck
  • Q3 2025120-day list3,991 ppm!; 3,459! at the first recheck; 32,507! at the second Fixes: re-tuned well, bentonite added
D
5A_VC_04 Stage 5Aon the 120-day list 3 times
  • Q1 2024120-day list1,130 ppm!; failed three times in the quarter
  • Q2 2024120-day listFailed three times again
  • Q3 2024Cleared by recheck1,775 ppm!; 4,755! at the first recheck Not on that quarter’s 120-day list
  • Q4 2024120-day list1,425 ppm!; 923! at the first recheck Fixes: well tuned, soil cover and compaction
  • Q2 2025Cleared by recheck2,560 ppm!; 15 at the first recheck
E
5B_VC_05 Stage 5Bon the 120-day list 2 times
  • Q1 2024120-day list62,000 ppm!; 2,645! at the first recheck Fix: new vacuum line installed
  • Q4 2025120-day list25,094 ppm!; 60,245! at the first recheck; 3,850! at the second Fix: vacuum increased
F
5B_VC_10 Stage 5Bon the 120-day list 2 times
  • Q2 2024120-day list992 ppm!; 1,455! at the next recheck Fixes: well tuned, soil cover added and compacted
  • Q4 2025120-day list57,260 ppm!; 20,786! at the first recheck; 7,453! at the second Fix: vacuum increased twice
G
5B_VC_07 Stage 5Bthe highest reading in the Mill Seat record
  • Q2 2025120-day list189,621 ppm!; 335,485! at the first recheck; 61,000! at the second 335,485 ppm! is about one-third methane at the surface, 671! times the limit
  • Q3 2025Cleared by recheck21.8 ppm at the 120-day follow-up Every Stage 5B vertical well numbered 01 to 10 was on a 120-day list at least once from 2024 to 2025

Gap 2 of 3: The duration The same wells failing from 2023 into 2025

The same wells keep failing, quarter after quarter

Eleven spots on the east side of High Acres, most of them in Cell 12, went on the 120-day list for new collection equipment more than once between 2023 and 2025. In between, many read thousands of ppm and were cleared at their follow-up checks.

All locations: High Acres

A
HAGW1224 Cell 12on the 120-day list 4 times
  • Sep 2023120-day listOver 500 ppm! at the initial scan and both rechecks Fix: increased vacuum
  • May 2024120-day list8,070 ppm!; 6,550!; then 48,000! at the second recheck
  • Nov 2024120-day list65,000 ppm!; 2,910! at the first recheck
  • Mar 2025Cleared by recheck734 ppm!; 12 at the first recheck
  • May 2025120-day list1,659 ppm!; 1,060! at the first recheck Fix: bentonite and dirt added
  • Nov 2025Over the limit1,779 ppm! 120-day status for Q4 2025 not yet reviewed
B
HAGW1228 Cell 12on the 120-day list 3 times
  • Feb 2023First scan26,000 ppm! on Cell 12’s first scan Placed on the 120-day list
  • Sep 2023120-day listOver 500 ppm! at the initial scan and both rechecks Fixes: repaired liner, increased vacuum
  • Mar 2024Cleared by recheck1,910 ppm!; corrected within the quarter, so no 120-day listing
  • Sep 2024Cleared by recheck1,555 ppm!; 4.6 after liner repair
  • Mar 2025Cleared by recheck5,402 ppm!; 54 after liner repair
  • May 2025120-day list1,833 ppm!; 4,585! at the first recheck Fixes: liner repaired, excursion welded
  • Nov 2025Over the limit8,613 ppm! 120-day status for Q4 2025 not yet reviewed
C
HAGW1226 and HIGOT404 Cell 12 edgetwo points about 10 feet apart
  • Feb 2023First scanHAGW1226: 1,220 ppm!; HIGOT404: 17,500!, then 44,000! at recheck Both placed on the 120-day list
  • Nov 2023120-day listBoth points failed three times again
  • May 2024Cleared by recheckHAGW1226: 33,000 ppm!, then 31,000!; HIGOT404: 30,400!, then 20,000! Both below 500 at the second recheck
  • May 2025120-day listHAGW1226: 85,089 ppm!; 20,000! at the first recheck; 6,890! a month later Fix: bentonite and dirt added
D
HAGW1105 Cell 11on the 120-day list 3 times
  • Feb 2023120-day listFailed three times in the quarter
  • Sep 2023120-day listOver 500 ppm! at the initial scan and both rechecks Fix: increased vacuum
  • Nov 2024120-day list8,830 ppm!; 2,260!; 1,550! a month later
  • Mar 2025Cleared by recheck1,765 ppm!; 7 at the first recheck
  • Aug 2025Cleared by recheck7,018 ppm!; 4,586! at the first recheck; 39 at the second
E
HAGW1230 Cell 12on the 120-day list 2 times
  • Feb 2023First scan15,900 ppm! on Cell 12’s first scan Placed on the 120-day list
  • Sep 2023Cleared by recheckOver 500 ppm!, then below 500 after liner repair
  • Nov 2023Cleared by recheckOver 500 ppm! at the initial scan and first recheck Fix: increased vacuum
  • Mar 2025Cleared by recheck601 ppm!; 77 after liner repair
  • May 2025120-day list14,846 ppm!; 804!; 1,370! a month later Fix: liner repaired
F
HAGW1229 Cell 12on the 120-day list 2 times
  • Feb 2023First scan1,335 ppm! on Cell 12’s first scan Placed on the 120-day list
  • Nov 2023Cleared by recheckOver 500 ppm!, then below 500 at recheck
  • Mar 2024Cleared by recheck1,050 ppm!; corrected within the quarter, so no 120-day listing
  • Aug 2025120-day list2,706 ppm!; 3,677! at the first recheck; 4,181! at the second Rising at each recheck
G
HAGW1209 Cell 12on the 120-day list 2 times
  • Feb 2023First scan20,000 ppm! on Cell 12’s first scan Placed on the 120-day list
  • Sep 2023120-day listOver 500 ppm! at the initial scan and both rechecks Fixes: repaired liner, increased vacuum
  • Mar 2024Cleared by recheck3,600 ppm!; corrected within the quarter, so no 120-day listing
  • Sep 2024Cleared by recheck984 ppm!; 2.5 at the first recheck
  • Nov 2024Cleared by recheck1,475 ppm!; 2.2 after resealing the liner base
  • Aug 2025Cleared by recheck1,736 ppm!; 44 after liner repair
H
HAGW1213 Cell 12on the 120-day list 2 times
  • Feb 2023First scan1,075 ppm! on Cell 12’s first scan
  • Sep 2023120-day listOver 500 ppm! at the initial scan and both rechecks Fixes: repaired liner, increased vacuum
  • Mar 2024Cleared by recheck12,000 ppm!; corrected within the quarter, so no 120-day listing
  • Sep 2024Cleared by recheck4,090 ppm!; 2.0 after liner repair
  • Mar 2025120-day list88,533 ppm!; 4,255! at the first recheck; 2,757! a month later Fixes: re-tuned well, liner repaired
I
HIGOT424Penetration · on the 120-day list 2 times
  • Nov 2023120-day listFailed three times in the quarter
  • May 2024120-day list2,515 ppm!; 34,000! at the first recheck; 8,530! at the second
J
HIGOT425 and HIGOT426Adjacent penetrations · each on the 120-day list 2 times
  • Sep 2023Cleared by recheckBoth over 500 ppm!, then below 500 after cover dirt was added
  • Nov 2023120-day listBoth failed three times in the quarter
  • May 2024120-day listHIGOT425: 3,210! → 2,820! → 8,165 ppm!; HIGOT426: 6,750! → 6,600! → 47,000 ppm! Both rose by the second recheck
K
HIGOT461Penetration · on the 120-day list 2 times
  • Mar 2025120-day list796 ppm!; 2,198! at the first recheck; 8,792! at the second Fix: re-tuned well, twice
  • Aug 2025120-day list6,310 ppm!; 1,997!; 5,533!

Gap 3 of 3: What the regulator sees Repeats flagged, routine fixes approved

DEC saw the repeats, and approved the same fixes anyway

Between February 2024 and June 2025, DEC approved Seneca Meadows’ fixes for 120-day locations six times. Every approval letter said the same thing: “There is a concern that corrective actions for repeat areas of exceedances may require additional follow-up between surface scan events.” Every one asked only for rescans. These five locations kept failing.

Northwest Expansion (A–C) and Southeast Landfill (D–E)

All locations: Seneca Meadows

A
NWX-GW-60 Stage 6, Northwest Expansiongrid 1311
  • Sep 2023First scan3,042 ppm! on Stage 6’s first-ever surface scan
  • Dec 2024120-day list2,766 ppm!; 3,100! and 2,500! at rechecks; 5,000! on Jan. 9 Fixes: vacuum adjustments, cover soil and bentonite. Snow and ice kept equipment off; the only location still over 500! in January
  • Jan 29, 2025Alternative remedyOperator asks DEC to accept the fixes as “alternative remedies”
  • Feb 3, 2025DEC responseDEC approves: “There is a concern that corrective actions for repeat areas of exceedances may require additional follow-up between surface scan events” Asks for rescans in Q1 and Q2 2025
  • Mar 2025120-day list10,000 ppm! (instrument maximum); 1,000!; 1,300!; 1,121!; below 500 on Apr. 28 Fixes: vacuum adjustments, cover soil, excavator tamper, bentonite
  • May 28, 2025Alternative remedyAlternative remedies requested again
  • Jun 11, 2025DEC responseDEC approves the Q1 2025 remedies with the same “concern” sentence as its February approval Asks for rescans in Q2 and Q3 2025
  • Jun 2025Over the limitDEC-requested rescan: 1,640 ppm! Fix: additional cover added
  • Sep 2025Over the limitDEC-requested rescan: 3,313 ppm!; 2,500!; 494; 492 Fix: vacuum adjusted and “additional collector installed”
B
NWX-GW-52 Stage 6, Northwest Expansiongrid 1360
  • Dec 2024120-day list10,000 ppm! (instrument maximum); 6,000!; 4,000!; 480 on Jan. 17 Fixes: vacuum adjustments, cover soil and bentonite
  • Mar 2025120-day list2,076 ppm!; 1,200!; 1,000!; 458 on Apr. 17 Fixes: vacuum adjustments, cover soil, excavator tamper
  • Both timesAlternative remedyAlternative remedies requested and approved by DEC in place of a new collection device
  • Sep 2025Over the limitDEC-requested rescan: 1,351 ppm!; 1,400!; 482; 497
C
NWX-GW-103 Stage 6, Northwest Expansiongrid 1669
  • Dec 2024120-day list10,000 ppm! (instrument maximum); 2,700!; 2,900!; 245 on Jan. 9 Fixes: vacuum adjustments, cover soil and bentonite
  • Mar 2025120-day list10,000 ppm! at the initial scan and first recheck; 1,000!; 492 on Apr. 17 Fixes: vacuum adjustments, cover soil, excavator tamper. A second point in the same grid, NWX-HCD-12-550, also went on the list
  • Both timesAlternative remedyAlternative remedies requested and approved by DEC in place of a new collection device
  • Sep 2025Over the limitDEC-requested rescan: 1,924 ppm!; 750!; 479; 380
D
Grid 2228 Southeast Landfillover 500 ppm in six quarters
  • Jun 2023120-day list7,593 ppm!; 1,200!; 1,017!; at least 10,000! on July 10 (a vertical flange) Fixes: liner sealer three times, vacuum
  • Late 2023Over the limitOver 500 ppm! in both Q3 and Q4 (a capped pipe)
  • Feb 9, 2024DEC responseDEC names grid 2228 as a repeat and asks for rescans, adding: “There is a concern that corrective actions for repeat areas of exceedances may require additional follow-up between surface scan events”
  • Oct 2024120-day list2,576 ppm!; 3,000!; 131; 45,000! (a capped vacuum line) Fix: liner repaired twice. The 120-day notice sent to DEC listed this reading as 4,500 ppm. DEC approves in December with the same “concern” sentence
  • Jun 2025Over the limitDEC-requested rescan: 1,670 ppm! (iso-valves) Fix: liner repaired
  • Sep 2025Over the limitAt least 10,000 ppm! on Sept. 9; 492; 92 Fix: liner repaired
E
SE-GW-FC-85 Southeast Landfillgrids 2282 and 2281
  • Nov 2023120-day list4,315 ppm!; 1,600!; 291; 2,783! Fixes: bentonite plug twice, cover soil
  • Jan 30, 2024Alternative remedyOperator promises to record readings here in Q2 and Q3 2024
  • Jun 2024120-day list719 ppm!; 8,000!; 6,500! Fixes: bentonite plug, abandoned an extra vacuum riser, cover soil. DEC approves in October with the same “concern” sentence